EV charging systems
AC and DC charging, connectors, protocols and designing a charging site.
Day 12 · 45 min
After this lesson
- You can explain AC vs DC charging and where the power conversion happens.
- You can name the connector standards and the OCPP and ISO 15118 protocols.
- You can size a charging site's power with load management.
Where the charger actually lives
Every EV battery charges on DC. The only question is where the grid's AC becomes DC: inside the car, in a small on-board charger, or in a large cabinet beside the parking space. That one choice explains the power levels, the connectors and most of the cost of a charging site.
AC charging: the charger is in the car
Level 1 uses a 120 V outlet at 12 A, about 1.4 kW, a few miles of range per hour. Level 2 uses 208-240 V at up to 80 A, 7-19 kW: 32 A at 240 V is 7.7 kW and 80 A is 19.2 kW. The wall box, properly the EVSE, is not a charger at all. It is a contactor, a ground-fault monitor that trips at 20 mA, and a signalling circuit. The car's on-board charger (OBC) does the AC-to-DC conversion, and its rating, commonly 7-11.5 kW, sets the ceiling because every kilowatt of converter rides around in the car. In Europe, Type 2 sockets add three-phase power: 400 V at 16 A is 11 kW and at 32 A is 22 kW.
The EVSE talks to the car over the control pilot, a 1 kHz, ±12 V square wave whose duty cycle advertises the most current the car may draw: amps = duty × 0.6 between 10 % and 85 % duty, so 53.3 % means 32 A. The car answers by loading the pilot: 9 V means plugged in, 6 V means ready for power.
DC fast charging: the charger is the cabinet
A DC fast charger (50-350 kW) moves the converter off the car. Grid AC, usually 480 V three-phase in North America, is rectified with power-factor correction to a DC link of roughly 800 V. An isolated DC-DC stage (a high-frequency inverter, transformer and rectifier) then produces whatever voltage and current the car requests. The transformer isolates the battery from the grid, so the car's high-voltage system stays floating and an insulation monitor can catch a single fault. Cabinets stack identical power modules of tens of kilowatts each, so one design scales and a charger can keep working at reduced power when a module fails. At 95 % efficiency a 150 kW charger still turns about 8 kW into heat, so fans or chillers are part of the design.
The cable is a thermal problem too. Above roughly 200-250 A a passively cooled cable gets too thick and heavy to handle, so high-power dispensers use liquid-cooled cables that carry 500 A or more through a thin, flexible conductor, with temperature sensors at the connector pins that cut the current if they get hot.
Connectors
| Connector | Where | AC | DC | Car-charger signalling |
|---|---|---|---|---|
| J1772 (Type 1) | North America | Single-phase, up to 80 A | No | PWM pilot |
| CCS1 | North America | Through its J1772 half | Two extra DC pins | PWM pilot + powerline (DIN 70121, ISO 15118) |
| NACS / SAE J3400 | North America | Yes, same pins | Yes, same pins | PWM pilot + powerline |
| CHAdeMO | Japan; legacy elsewhere | No | Yes, bidirectional | CAN bus |
| Type 2 / CCS2 | Europe | 1- or 3-phase, up to 22 kW | CCS2 adds two DC pins | PWM pilot + powerline |
Tesla opened its connector as the North American Charging Standard in November 2022 and SAE standardized it as J3400; most automakers have since announced a move to it, with adapters bridging the CCS1 fleet. China uses its own GB/T connectors.
Protocols: ISO 15118 and OCPP
ISO 15118 (and its predecessor DIN SPEC 70121) is the conversation between car and charger, carried as powerline communication over the pilot wire. The car states its limits, the charger states its own, and during charging the car requests current in a continuous loop that the charger follows. ISO 15118 also defines Plug & Charge: the car stores a contract certificate and is authenticated and billed automatically, with no card or app; ISO 15118-20 adds bidirectional power. OCPP (Open Charge Point Protocol; 1.6 and 2.0.1 are the most widely deployed versions) is the conversation between charger and the operator's backend: JSON over a WebSocket for authorization, transactions, meter values, status, firmware and smart-charging profiles that cap a charger's power. Because OCPP is open, a site owner can change backend providers without replacing hardware.
Designing the site
Charger internals drive the site design. Power flows from the utility's medium-voltage line through a pad-mount transformer (for example 12.47 kV to 480Y/277 V), main switchgear and feeders to the power cabinets and dispensers. The NEC treats EV charging as a continuous load, sized at 125 %, but NEC 625.42 lets an automatic load management system set the design load instead of the nameplate sum. That is how eight 150 kW dispensers can share 600 kW of cabinets: at any moment most sessions are tapering or idle, so the transformer and service are sized near 600 kW rather than 1.2 MW, and the utility's demand charge on the monthly peak shrinks with them.
Accessible stalls are designed in, not added later. In California, CBC Table 11B-228.3.2.1 sets how many accessible EV spaces a site needs and Sections 11B-812.6 and 11B-812.7 their geometry (2022 edition, unchanged in 2025): every space is 216 in (18 ft) long, a van-accessible space is 144 in (12 ft) wide and a standard accessible space 108 in (9 ft) wide, each with a 60 in (5 ft) access aisle, and an ambulatory space is 120 in wide with no aisle. Operable parts, including the connector, must sit within accessible reach ranges and work with one hand, so cable weight, reach and cable management matter as much as amps; lighter liquid-cooled cables help.
V2G, V2H and interoperability
With a bidirectional charger the car becomes a battery for the home (V2H) or the grid (V2G). CHAdeMO did this first; ISO 15118-20 brings it to CCS and NACS, and AC versions need a bidirectional on-board charger. Exporting to the grid needs utility interconnection approval and certified equipment, such as UL 1741-SB inverters in the US. Interoperability is the industry's sore point: many failed sessions are communication failures (SLAC timeouts, certificate errors, a failed insulation check) rather than broken power hardware. The US NEVI program's minimum standards (23 CFR 680, in force since 2023 and kept by FHWA's 2025 guidance revision) require at least four DC ports that deliver 150 kW each at the same time (680.106), OCPP and ISO 15118 conformance (680.108) and 97 % uptime per port (680.116).
Interactive: one session, from plug to stop
Play the DC session, then raise the other stalls' load until the site cap, not the dispenser, limits this car. Switch to AC to see the pilot duty cycle change with the power the load manager can give.
A charging session, step by step
Follow one session from plug-in to stop. The power you get is the lowest of three limits: what the car asks for, what the dispenser can deliver and what the site's load manager has left.
Car asks for 250 kW → dispenser rating 150 kW → site headroom 150 kW → granted 150 kW, set by the dispenser rating.
Step 1 of 7
Plug in
The driver plugs in a CCS1 or NACS (SAE J3400) connector. A resistor on the proximity pin tells the car a plug is latched, and the car's pilot resistor pulls the control pilot from 12 V to 9 V (state B). The charger answers with a 5 % duty cycle, which means: use digital communication.
- Pilot: state A (12 V) → state B (9 V)
- Pilot PWM at 5 % duty = high-level communication
- OCPP StatusNotification: Preparing
In practice
Practice
Size the service for a highway site
A site has 8 dispensers rated 150 kW with 2:1 power sharing. The power cabinets are 95 % efficient at 0.99 power factor, and lighting, controls and HVAC add 15 kVA. Find the shared cabinet power, the transformer (standard sizes 500, 750, 1,000, 1,500 kVA) and the 480 V main breaker, treating the load as continuous.
nameplate = 8 × 150 kW = 1,200 kW
shared (2:1) = 1,200 ÷ 2 = 600 kW (4 cars at 150 kW, or 8 at 75 kW)
cabinet input = 600 ÷ 0.95 = 631.6 kW
apparent power = 631.6 ÷ 0.99 = 638.0 kVA
site total = 638.0 + 15 = 653.0 kVA
transformer = next standard size = 750 kVA (87 % loaded at the cap)
current at 480 V = 653,000 ÷ (√3 × 480) = 785 A
continuous 125 % = 785 × 1.25 = 982 A → 1,000 A main breaker
without sharing = 1,200 ÷ 0.95 ÷ 0.99 + 15 = 1,291 kVA → 1,500 kVA transformerAnswer: 600 kW of shared cabinets, about 653 kVA of demand, a 750 kVA transformer and a 1,000 A main breaker at 480 V. Four cars at 150 kW at once is also the NEVI minimum, so the cap meets it exactly. At an assumed demand charge of $20 per kW of monthly peak, capping the charging input near 632 kW instead of about 1,263 kW avoids up to about $12,600 a month. In California, CBC Table 11B-228.3.2.1 then calls for one van-accessible and one standard accessible EV space for a site with 5 to 25 chargers (2022 and 2025 editions); confirm against the edition your jurisdiction has adopted.
Real-world scenario
Real-world scenario
Afternoon sessions stuck at 50 kW
A highway site in California's Central Valley has four 150 kW dispensers with liquid-cooled cables, sharing power cabinets under a load-management cap that is rarely reached. In July, drivers start complaining: morning sessions run at 130-150 kW, but between 1 pm and 6 pm the same cars charge at about 50 kW. The load manager shows plenty of headroom and the utility reports no voltage problems.
Symptoms
- Afternoon sessions on all four dispensers settle near 50 kW (about 125 A into a 400 V pack) within a few minutes of starting.
- An 800 V car on the same dispenser in the afternoon gets about 100 kW, which is the same 125 A, not the same power.
- OCPP MeterValues show the Temperature measurand at location Cable climbing to its configured limit just before each current drop; cabinet module temperatures stay normal.
- Afternoon ambient is 41-44 °C and the dispensers face west in full sun.
Interview questions
screenWhat is the difference between AC and DC charging?
screenWhat do OCPP and ISO 15118 each do?
deepSize the electrical service for eight 150 kW dispensers with 2:1 power sharing.
deepWhy does a DC fast charger derate on a hot day, and what would you do about it at the site level?
screenHow does a J1772 EVSE tell the car how much current it may draw?
screenWhat is NACS (SAE J3400), and why did it spread so quickly?
Quiz
References and further reading
Where the ideas in this lesson come from, and what to read next. Books are the standard texts; papers are the original sources; standards are what employers work to.
- Standard
Read: The coupler ratings behind the 400 A and 500 A cable figures.
- Standardfree online
Read: Sections 680.106, 680.108 and 680.116: the port count, power, protocols and uptime quoted in the lesson.
- Standard
Read: The AC connector and the pilot signal.
- Standard
SAE International (2024). SAE J3400: NACS Electric Vehicle Coupler. SAE.
Read: The NACS connector standard.
- Standard
Read: Plug and charge and bidirectional charging.
- Standardfree online
Open Charge Alliance (2020). Open Charge Point Protocol 2.0.1. Open Charge Alliance.
Read: Charger-to-back-office messages and load management.
- Standard
Read: Charging modes and safety.
- Standard
Read: US installation rules.
- Standardfree online
US Department of Justice (2010). 2010 ADA Standards for Accessible Design. US DOJ.
Read: Federal accessibility baseline.
- Standard
Read: California accessible EV space requirements; verify against your adopted edition.