AC and DC charging, connectors, protocols and designing a charging site.

Day 12 · 45 min

After this lesson

  • You can explain AC vs DC charging and where the power conversion happens.
  • You can name the connector standards and the OCPP and ISO 15118 protocols.
  • You can size a charging site's power with load management.

Where the charger actually lives

Every EV battery charges on DC. The only question is where the grid's AC becomes DC: inside the car, in a small on-board charger, or in a large cabinet beside the parking space. That one choice explains the power levels, the connectors and most of the cost of a charging site.

AC charging: the charger is in the car

Level 1 uses a 120 V outlet at 12 A, about 1.4 kW, a few miles of range per hour. Level 2 uses 208-240 V at up to 80 A, 7-19 kW: 32 A at 240 V is 7.7 kW and 80 A is 19.2 kW. The wall box, properly the EVSE, is not a charger at all. It is a contactor, a ground-fault monitor that trips at 20 mA, and a signalling circuit. The car's on-board charger (OBC) does the AC-to-DC conversion, and its rating, commonly 7-11.5 kW, sets the ceiling because every kilowatt of converter rides around in the car. In Europe, Type 2 sockets add three-phase power: 400 V at 16 A is 11 kW and at 32 A is 22 kW.

The EVSE talks to the car over the control pilot, a 1 kHz, ±12 V square wave whose duty cycle advertises the most current the car may draw: amps = duty × 0.6 between 10 % and 85 % duty, so 53.3 % means 32 A. The car answers by loading the pilot: 9 V means plugged in, 6 V means ready for power.

DC fast charging: the charger is the cabinet

A DC fast charger (50-350 kW) moves the converter off the car. Grid AC, usually 480 V three-phase in North America, is rectified with power-factor correction to a DC link of roughly 800 V. An isolated DC-DC stage (a high-frequency inverter, transformer and rectifier) then produces whatever voltage and current the car requests. The transformer isolates the battery from the grid, so the car's high-voltage system stays floating and an insulation monitor can catch a single fault. Cabinets stack identical power modules of tens of kilowatts each, so one design scales and a charger can keep working at reduced power when a module fails. At 95 % efficiency a 150 kW charger still turns about 8 kW into heat, so fans or chillers are part of the design.

The cable is a thermal problem too. Above roughly 200-250 A a passively cooled cable gets too thick and heavy to handle, so high-power dispensers use liquid-cooled cables that carry 500 A or more through a thin, flexible conductor, with temperature sensors at the connector pins that cut the current if they get hot.

Block diagram of a DC fast charger from the grid connection to the vehicle connectorInside a DC fast chargerpower path →one power module, tens of kW; cabinets stack several in parallelGrid480 V3-phase ACInputbreaker +contactorAC → DCrectifierwith PFCDC link~800 VIsolated DC-DCHF inverter,transformer,rectifierOutputcontactors,precharge,insulation mon.Liquid-cooledcable andconnector,pin sensorsCharger controllerISO 15118 / DIN 70121 to the car over the pilot wireOCPP to the backend; sets module current, works contactorsBackend (CSMS)auth, billing, status,power limits via OCPPcooling: module fans or chiller, cable coolant loop
Inside a DC fast charger: grid AC is rectified with power-factor correction onto a DC link, an isolated high-frequency DC-DC stage sets the voltage and current the car asks for, and the controller talks to the car (ISO 15118) and the backend (OCPP).

Connectors

ConnectorWhereACDCCar-charger signalling
J1772 (Type 1)North AmericaSingle-phase, up to 80 ANoPWM pilot
CCS1North AmericaThrough its J1772 halfTwo extra DC pinsPWM pilot + powerline (DIN 70121, ISO 15118)
NACS / SAE J3400North AmericaYes, same pinsYes, same pinsPWM pilot + powerline
CHAdeMOJapan; legacy elsewhereNoYes, bidirectionalCAN bus
Type 2 / CCS2Europe1- or 3-phase, up to 22 kWCCS2 adds two DC pinsPWM pilot + powerline

Tesla opened its connector as the North American Charging Standard in November 2022 and SAE standardized it as J3400; most automakers have since announced a move to it, with adapters bridging the CCS1 fleet. China uses its own GB/T connectors.

Protocols: ISO 15118 and OCPP

ISO 15118 (and its predecessor DIN SPEC 70121) is the conversation between car and charger, carried as powerline communication over the pilot wire. The car states its limits, the charger states its own, and during charging the car requests current in a continuous loop that the charger follows. ISO 15118 also defines Plug & Charge: the car stores a contract certificate and is authenticated and billed automatically, with no card or app; ISO 15118-20 adds bidirectional power. OCPP (Open Charge Point Protocol; 1.6 and 2.0.1 are the most widely deployed versions) is the conversation between charger and the operator's backend: JSON over a WebSocket for authorization, transactions, meter values, status, firmware and smart-charging profiles that cap a charger's power. Because OCPP is open, a site owner can change backend providers without replacing hardware.

Designing the site

Charger internals drive the site design. Power flows from the utility's medium-voltage line through a pad-mount transformer (for example 12.47 kV to 480Y/277 V), main switchgear and feeders to the power cabinets and dispensers. The NEC treats EV charging as a continuous load, sized at 125 %, but NEC 625.42 lets an automatic load management system set the design load instead of the nameplate sum. That is how eight 150 kW dispensers can share 600 kW of cabinets: at any moment most sessions are tapering or idle, so the transformer and service are sized near 600 kW rather than 1.2 MW, and the utility's demand charge on the monthly peak shrinks with them.

Accessible stalls are designed in, not added later. In California, CBC Table 11B-228.3.2.1 sets how many accessible EV spaces a site needs and Sections 11B-812.6 and 11B-812.7 their geometry (2022 edition, unchanged in 2025): every space is 216 in (18 ft) long, a van-accessible space is 144 in (12 ft) wide and a standard accessible space 108 in (9 ft) wide, each with a 60 in (5 ft) access aisle, and an ambulatory space is 120 in wide with no aisle. Operable parts, including the connector, must sit within accessible reach ranges and work with one hand, so cable weight, reach and cable management matter as much as amps; lighter liquid-cooled cables help.

V2G, V2H and interoperability

With a bidirectional charger the car becomes a battery for the home (V2H) or the grid (V2G). CHAdeMO did this first; ISO 15118-20 brings it to CCS and NACS, and AC versions need a bidirectional on-board charger. Exporting to the grid needs utility interconnection approval and certified equipment, such as UL 1741-SB inverters in the US. Interoperability is the industry's sore point: many failed sessions are communication failures (SLAC timeouts, certificate errors, a failed insulation check) rather than broken power hardware. The US NEVI program's minimum standards (23 CFR 680, in force since 2023 and kept by FHWA's 2025 guidance revision) require at least four DC ports that deliver 150 kW each at the same time (680.106), OCPP and ISO 15118 conformance (680.108) and 97 % uptime per port (680.116).

Interactive: one session, from plug to stop

Play the DC session, then raise the other stalls' load until the site cap, not the dispenser, limits this car. Switch to AC to see the pilot duty cycle change with the power the load manager can give.

A charging session, step by step

Follow one session from plug-in to stop. The power you get is the lowest of three limits: what the car asks for, what the dispenser can deliver and what the site's load manager has left.

DC fast charging session, step 1: Plug in1. Plug in2. Handshake3. Authorize4. Negotiate5. Charging6. Taper7. Stopbattery + BMSOBCbypassed (DC)pilot: PWM + powerlinepilot 12 V → 9 V (B)--Dispenser150 kW maxPower cabinetrectifier + PFCisolated DC-DCshared by 8 stallsUtility750 kVA transformer480 V, 3-phaseCSMS backendOCPP over WebSocketSite loadcap 600 kWother stalls 450 kW + this car 0.0 kW = 450 kW of 600 kW

Car asks for 250 kW → dispenser rating 150 kW → site headroom 150 kW → granted 150 kW, set by the dispenser rating.

Step 1 of 7

Plug in

The driver plugs in a CCS1 or NACS (SAE J3400) connector. A resistor on the proximity pin tells the car a plug is latched, and the car's pilot resistor pulls the control pilot from 12 V to 9 V (state B). The charger answers with a 5 % duty cycle, which means: use digital communication.

  • Pilot: state A (12 V) → state B (9 V)
  • Pilot PWM at 5 % duty = high-level communication
  • OCPP StatusNotification: Preparing
Charging
Highway site: 8 × 150 kW dispensers sharing 600 kW of power cabinets (2:1).

In practice

Practice

Size the service for a highway site

A site has 8 dispensers rated 150 kW with 2:1 power sharing. The power cabinets are 95 % efficient at 0.99 power factor, and lighting, controls and HVAC add 15 kVA. Find the shared cabinet power, the transformer (standard sizes 500, 750, 1,000, 1,500 kVA) and the 480 V main breaker, treating the load as continuous.

text
nameplate        = 8 × 150 kW               = 1,200 kW
shared (2:1)     = 1,200 ÷ 2                = 600 kW  (4 cars at 150 kW, or 8 at 75 kW)
cabinet input    = 600 ÷ 0.95               = 631.6 kW
apparent power   = 631.6 ÷ 0.99             = 638.0 kVA
site total       = 638.0 + 15               = 653.0 kVA
transformer      = next standard size       = 750 kVA  (87 % loaded at the cap)
current at 480 V = 653,000 ÷ (√3 × 480)     = 785 A
continuous 125 % = 785 × 1.25               = 982 A  → 1,000 A main breaker

without sharing  = 1,200 ÷ 0.95 ÷ 0.99 + 15 = 1,291 kVA → 1,500 kVA transformer

Answer: 600 kW of shared cabinets, about 653 kVA of demand, a 750 kVA transformer and a 1,000 A main breaker at 480 V. Four cars at 150 kW at once is also the NEVI minimum, so the cap meets it exactly. At an assumed demand charge of $20 per kW of monthly peak, capping the charging input near 632 kW instead of about 1,263 kW avoids up to about $12,600 a month. In California, CBC Table 11B-228.3.2.1 then calls for one van-accessible and one standard accessible EV space for a site with 5 to 25 chargers (2022 and 2025 editions); confirm against the edition your jurisdiction has adopted.

Real-world scenario

Real-world scenario

Afternoon sessions stuck at 50 kW

A highway site in California's Central Valley has four 150 kW dispensers with liquid-cooled cables, sharing power cabinets under a load-management cap that is rarely reached. In July, drivers start complaining: morning sessions run at 130-150 kW, but between 1 pm and 6 pm the same cars charge at about 50 kW. The load manager shows plenty of headroom and the utility reports no voltage problems.

Symptoms

  • Afternoon sessions on all four dispensers settle near 50 kW (about 125 A into a 400 V pack) within a few minutes of starting.
  • An 800 V car on the same dispenser in the afternoon gets about 100 kW, which is the same 125 A, not the same power.
  • OCPP MeterValues show the Temperature measurand at location Cable climbing to its configured limit just before each current drop; cabinet module temperatures stay normal.
  • Afternoon ambient is 41-44 °C and the dispensers face west in full sun.

Interview questions

screenWhat is the difference between AC and DC charging?
Batteries charge on DC, so the question is where the conversion happens. With AC charging the wall box only switches and protects, and the car's on-board charger rectifies the AC, so power is limited to roughly 7-19 kW by what is practical to carry in the car. With DC fast charging the station rectifies and converts, delivering 50-350 kW straight to the battery through the car's DC contactors, while the car's BMS tells the charger how much current to supply. That is why DC chargers are large, expensive, liquid-cooled cabinets and AC chargers are relatively simple boxes.
screenWhat do OCPP and ISO 15118 each do?
They cover different links. ISO 15118, like the older DIN SPEC 70121, runs between the car and the charger as powerline communication on the pilot wire: limits, the current-demand loop, Plug & Charge certificates and, in ISO 15118-20, bidirectional power. OCPP runs between the charger and the operator's backend over a WebSocket: authorization, transaction start and stop, meter values for billing, status, firmware updates and smart-charging profiles that cap power. A good mental model is that ISO 15118 decides how this car charges, and OCPP lets an operator run and bill a whole fleet of chargers.
deepSize the electrical service for eight 150 kW dispensers with 2:1 power sharing.
Nameplate is 1.2 MW, but with 2:1 sharing the cabinets deliver at most 600 kW, so I size from the managed cap, which NEC 625.42 allows when an automatic load management system enforces it. At 95 % efficiency and 0.99 power factor that is about 638 kVA, plus about 15 kVA of lighting and controls, roughly 653 kVA, so a 750 kVA transformer. At 480 V that is about 785 A, and 125 % for a continuous load gives about 982 A, so a 1,000 A main. I would also ask about the utility's demand charges, leave conduit and pad space for growth, and lay out the accessible stalls and cable reach before the electrical design is frozen.
deepWhy does a DC fast charger derate on a hot day, and what would you do about it at the site level?
Everything in the power path is thermally limited: the power modules' semiconductors, the magnetics, and especially the cable and connector, whose heating goes as current squared. A liquid-cooled cable dumps its heat through a small radiator, so high ambient, direct sun or a clogged radiator raises the coolant temperature until the connector's pin sensors force a lower current. You can spot a cable limit because cars with different pack voltages derate to the same current rather than the same power. At the site level I would add shade and clear airflow, put radiator cleaning on the maintenance plan, alarm on OCPP cable-temperature and derate events, and specify equipment by its derating curve at the local design ambient.
screenHow does a J1772 EVSE tell the car how much current it may draw?
Through the control pilot, a 1 kHz, ±12 V square wave generated by the EVSE. The duty cycle sets the limit: between 10 % and 85 % duty, amps = duty × 0.6, so 50 % means 30 A, and 85-96 % covers 51-80 A. The car signals its state by loading the pilot with resistors, 9 V for connected and 6 V for ready, and the EVSE only closes its relay once it sees 6 V. A 5 % duty cycle is special: it means digital communication is required, which is how DC fast charging sessions begin.
screenWhat is NACS (SAE J3400), and why did it spread so quickly?
It is Tesla's connector, opened as the North American Charging Standard in November 2022 and standardized by SAE as J3400. It is small, carries AC and DC on the same pins, and came with the largest fast-charging network in North America, so automakers gained access to that network by adopting it. Most announced a switch for new models, with adapters bridging CCS1 cars in the meantime. For site designers it means planning for both connectors for years, often on the same dispenser.

Quiz

1. A Level 2 EVSE allows 32 A at 240 V. About how much power can the car draw?
2. During DC fast charging, where is AC converted to DC?
3. OCPP is the protocol between
4. Plug & Charge, where the car authenticates itself with a certificate, is defined in
5. A J1772 pilot runs at 50 % duty cycle. What current may the car draw?
6. Eight 150 kW dispensers share power cabinets at a 2:1 ratio. Around what charging power should the service be sized?
7. On a 44 °C afternoon a 150 kW dispenser delivers about 50 kW, and an 800 V car on it draws the same current as a 400 V car. What is the most likely limit?

References and further reading

Where the ideas in this lesson come from, and what to read next. Books are the standard texts; papers are the original sources; standards are what employers work to.

  1. Standard

    IEC (2022). IEC 62196-3:2022: Plugs, socket-outlets, vehicle connectors and vehicle inlets, Part 3: Dimensional compatibility requirements for DC and AC/DC pin and contact-tube vehicle couplers. IEC.

    Read: The coupler ratings behind the 400 A and 500 A cable figures.

  2. Standardfree online

    Federal Highway Administration (2023). 23 CFR Part 680: National Electric Vehicle Infrastructure Standards and Requirements. Code of Federal Regulations.

    Read: Sections 680.106, 680.108 and 680.116: the port count, power, protocols and uptime quoted in the lesson.

  3. Standard

    SAE International (2017). SAE J1772: Electric Vehicle and Plug-in Hybrid Electric Vehicle Conductive Charge Coupler. SAE.

    Read: The AC connector and the pilot signal.

  4. Standard

    SAE International (2024). SAE J3400: NACS Electric Vehicle Coupler. SAE.

    Read: The NACS connector standard.

  5. Standard

    ISO (2022). ISO 15118-20: Road Vehicles, Vehicle to Grid Communication Interface, 2nd Generation Network Layer and Application Layer Requirements. ISO.

    Read: Plug and charge and bidirectional charging.

  6. Standardfree online

    Open Charge Alliance (2020). Open Charge Point Protocol 2.0.1. Open Charge Alliance.

    Read: Charger-to-back-office messages and load management.

  7. Standard

    IEC (2017). IEC 61851-1: Electric Vehicle Conductive Charging System, Part 1: General Requirements. IEC.

    Read: Charging modes and safety.

  8. Standard

    NFPA (2023). NFPA 70, National Electrical Code, Article 625: Electric Vehicle Power Transfer System. NFPA.

    Read: US installation rules.

  9. Standardfree online

    US Department of Justice (2010). 2010 ADA Standards for Accessible Design. US DOJ.

    Read: Federal accessibility baseline.

  10. Standard

    California Building Standards Commission (2022). California Building Code, Chapter 11B: Accessibility to Public Buildings (Section 11B-812, Electric Vehicle Charging Stations). CBC.

    Read: California accessible EV space requirements; verify against your adopted edition.